KitLog pro

Powered By Kitlog Pro v2.0

ONEX #54 Web Site
' style=
Date:  12-24-2011
Number of Hours:  0.00
Manual Reference:  Rev log 12/19/11
Brief Description:  Updated prints per rev log dtd 12/19/11

Went through Required and Optional Onex Revision Log dated 12/19/11 and updated drawing set printed 11/11/11. Found a couple of possible minor corrections I'll send to Sonex.

On Optional item dtd 8/2/11, ONX-W04-01 L/R, the correct number of rivets should probably be 56 including the short hinge, not the 54 indicated. On the hinge, -10, the number of holes should be 54 by my count, not 55. The 56 rivets required should also apply to rev dtd 8/11/11

2 hours
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.